Friday, August 21, 2026
GlobeNewsInfo Logo
Home / Infrastructure / AFRY takes EPCM role in Brazil’s Cabaçal copper and gold mine development

AFRY takes EPCM role in Brazil’s Cabaçal copper and gold mine development

Published on
AFRY takes EPCM role in Brazil’s Cabaçal copper and gold mine development
Image used for illustrative purposes only. GlobeNewsInfo / Visuals

AFRY has secured an engineering, procurement and construction management (EPCM) assignment for the Cabaçal copper, gold and silver mining project in Mato Grosso, Brazil. The two-year engagement covers processing plant engineering, infrastructure development, procurement support and construction oversight for a facility designed to process 2.5 million tonnes of ore annually.

BRAZIL —AFRY has been appointed to oversee engineering and project execution activities for the Cabaçal mining development in Mato Grosso, Brazil, working with Rio Cabaçal Mineração, a subsidiary of Meridian Mining. The assignment covers engineering, procurement and construction management (EPCM) services for the planned copper, gold and silver operation and is expected to continue for approximately two years.

The development includes a mineral processing facility designed to handle 2.5 million tonnes of ore annually. Supporting infrastructure will comprise electrical power supply and distribution networks, water management systems, operational utilities, processing installations and associated structures required for the mining operation.

AFRY's responsibilities extend across engineering development and construction execution. Initial activities will involve evaluating the existing basic engineering documentation, identifying opportunities to improve the design and assessing whether the proposed facilities can be constructed efficiently. The company will also prepare project execution plans and deliver detailed multidisciplinary engineering for the processing plant and related infrastructure.

Procurement activities will receive technical support from AFRY, while the subsequent construction phase will involve site management, field engineering, quality control, occupational health and safety supervision and commissioning assistance. This integrated scope places AFRY across several critical stages of project delivery, from engineering refinement through the preparation of operational facilities.

The appointment is significant for Brazil's mining sector, particularly the development of copper and precious-metal production capacity. Copper is an important industrial input for electricity networks, renewable energy infrastructure and electrification, while gold and silver provide additional mineral outputs. The processing facility and associated utilities will also generate requirements for engineering contractors, equipment suppliers, construction companies and infrastructure service providers.

For project stakeholders, the EPCM arrangement provides a coordinated framework for managing engineering decisions, procurement interfaces and construction activities. Reviewing the existing design before detailed engineering and construction could help identify technical issues early and improve coordination between contractors and suppliers. The two-year assignment also provides visibility into the project's planned execution period, although no specific commissioning date or production start date has been disclosed.

AFRY is an international engineering, design and advisory company providing services across industrial, energy and infrastructure markets. Meridian Mining is a mining company focused on mineral resource development, while Rio Cabaçal Mineração is its subsidiary responsible for the Brazilian Cabaçal project.

About GlobeNewsInfo

GlobeNewsInfo is a business news platform providing latest updates on global business developments, projects, and contract opportunities across diverse sectors and regions. The platform is designed to serve as a trusted source of information for companies, investors, and professionals worldwide.

More on Infrastructure

Latest Business News

Share this Article

Just In
2 hours ago NDB funds Uzbekistan's move away from gas dependence with 300 million USD multi-technology loan 2 hours ago OTDC launches tenders for Al Hoota Cave Destination Enhancement Project 3 hours ago European Commission conditionally approves EUR 2.67 billion final tranche for Croatia under recovery mechanism 3 hours ago EIB backs Gradyent with EUR 20 million for district heating optimization